04/24/2024
|
Big 50M, 2B Chips Gtd
|
44,000,000.00+6,000,000.00
|
7/22
|
0.00
|
04/19/2024
|
The Spider 8M [8-Max], 200M Chips Gtd
|
7,040,000.00+960,000.00
|
6/42
|
24,800,000.00
|
03/06/2024
|
The Mini Freezeout 10M, 500M Chips Gtd
|
8,800,000.00+1,200,000.00
|
57/97
|
0.00
|
03/06/2024
|
Big 50M, 2B Chips Gtd
|
44,000,000.00+6,000,000.00
|
9/34
|
0.00
|
03/01/2024
|
The Spider 8M [8-Max], 200M Chips Gtd
|
7,040,000.00+960,000.00
|
7/32
|
0.00
|
02/29/2024
|
The Freezeout 100M, 3B Chips Gtd
|
88,000,000.00+12,000,000.00
|
15/49
|
0.00
|
02/29/2024
|
Big 50M, 2B Chips Gtd
|
44,000,000.00+6,000,000.00
|
16/30
|
0.00
|
02/29/2024
|
The Freezout 100M, 2B Chips Gtd
|
88,000,000.00+12,000,000.00
|
21/38
|
0.00
|
02/28/2024
|
The Freezeout 100M, 3B Chips Gtd
|
88,000,000.00+12,000,000.00
|
18/30
|
0.00
|
02/27/2024
|
Big 50M, 3B Chips Gtd
|
44,000,000.00+6,000,000.00
|
8/78
|
115,600,000.00
|